Another project was perfectly accomplished by the Elite Construction crew! The crew was able to identify the dry rot damage that appeared on the door and jambs. They carefully removed the door strip and molding, then cut the damaged frame away and glue the new timber into place. The final touch was to sand the repaired area smooth.

The last but not lists was to remove combed trim water table where the dry rot damage was also identified. As you can see on pictures it was done very professionally by the crew.

Sacramento, CA
Menu