Location: Rocklin, CA
Project Type: The exterior trim, T1-11 siding and trim, the pedestrian door and jambs, the support post

Description: Damage noted to the exterior trim, T1-11 siding and trim, the pedestrian door and jambs, the support post caused by uncontrollable exterior moisture sources.

RECOMMENDATION:
Cut back and remove trim as necessary. Remove and replace damaged siding utilizing complete sheets where practical. Remove and replace
the damaged portions of siding using galvanized z-bar where necessary. Install new trim at repaired areas only.

PAINTING:
Prime paint on all exterior surfaces included in this estimate in the event that pre-primed wood is not used. Elite Construction and Remodel
to color match and paint the repaired areas only as discussed with the client. Elite Construction and Remodel is not responsible for color
match due to the age of the old painted surfaces compared to the new painted surface.

El Dorado Hills, CA
Menu